| JMS© Estimating (EST) provides
advanced estimating capability for EPC and EPCM projects. EST is especially
suitable for international projects dealing with large number of packages,
multiple currencies and multi-funding sources. On site, it can be used for
the preparation of change orders and as a powerful tool to perform cost
analysis of estimates prepared by sub-contractors.
Unlike conventional estimating system which finality is only to produce
estimating reports as an estimator perspective, data generated by EST
is specially structured so it can be automatically transferred in a matter
of second to other modules of JMS© such as CCS (Capital Control)
CMS (Contract Management) CPS (Construction Management) etc so data can
be immediately used for management, planning, controls and project execution.
EST contains several unique features such as multi-user capability allowing
Management to monitor on line the progress of the preparation of an estimate
while several estimators work on the same estimate.
Summary estimate information in graphical format can be displayed for
quick analysis allowing drill down capability at level of estimating account.
The multi package capability is a unique feature that allows to change
the packaging strategy of the project without altering the integrity of
the budget estimate file. This process is carried out during the planning
phase in order to establish the project best strategy and during the execution
phase to reflect packaging changes. Such feature allows to produce very
quickly detail budget estimate for all Project’s Purchase Orders
and Contracts while maintaining cost information perfectly synchronized
with the Budget. This is accomplished automatically without any manual
data entry.
The Pareto analysis, a powerful feature of EST, will help to focus on
where the money is, by avoiding to spend valuable estimating man-hours
to generate unnecessary estimating detail representing only small percentage
of the estimate cost. |
On line cost distribution(by
discipline) |